Description
What is Chemetall LD7?
Chemetall LD7 and LD9 are liquid suspensions of an inert white powder in a quick drying solvent with low sulphur, halogen and alkali metal content. LD7 and LD9 are used as developers in penetrant testing of forged parts, welds, cast and drop forged parts. LD9 offers best results with both color contrast and fluorescent penetrants while the thin, translucent layer provided by LD7 will make it especially suited for fluorescent penetrant testing applications. LD7 and LD9 are available as bulk material and as aerosol. They are typically used in a penetrant system with Checkmor® or Britemor® penetrants and their S series of removers.
Method of use
- Pre-cleaning, penetrant & excess penetrant removal
Clean part with e.g. S72, S76, S80 or S85 before applying the Checkmor® or Britemor® penetrant. Apply cleaner to the part and wipe clean with cloth. Surface has to be free of grease, oil and dirt. Allow part to dry before applying penetrant. Apply a thin even film of Checkmor® or Britemor® penetrant to cover test area and allow penetration as per the required time. Remove excess surface penetrant with clean cloths, pre-moistened with cleaner (e.g. S72, S76, S80 or S85). Alternatively, removal can be affected by gentle water spray or by rinsing with water (for application over 5°C / 41°F). Do not flush surface with cleaner as sensitivity will be impaired. Repeat procedure until surface penetrant has been removed. Thoroughly dry the component surface before developer application. - Developing
Chemetall LD7 or LD9 are liquid suspensions of solid particles which settle-out on standing; and therefore, aerosols and bulk containers must be shaken thoroughly before and during use. Spray thin, even developer film over area to be inspected (spraying distance 30 cm / 1 ft.). Surface temperature should be between -10 and 50°C (15-120°F). Chemetall LD7 must be applied by a light even spray (immersion or brushing will cause a loss of process sensitivity). When LD7 is used as part of a Britemor® fluorescent penetrant process, it should be applied by successive spraying until a translucent layer is achieved. Allow 10 – 30 minutes developing time before evaluation. - Inspection
For Checkmor® color contrast processes, inspection should be carried out in diffused white light of at least 500 lux (approx. 46 ft.cdl) and in the case of Britemor® fluorescent penetrant processes under UVA of 365 nm peak wavelength, typical output of 1200 µwatts/cm² at 38 cm from the component.
Note: the procedure above is a recommendation only; where relevant, the process specifications of the approving authorities must be followed. - Effects on materials
Chemetall LD7 and LD9 are used in the prescribed manner, no significant corrosion is likely to occur on commonly used constructional metals. LD7 and LD9 may cause swelling of some rubbers and plastics, the product should be tested for compatibility before application. (source)
We supply Chemetall LD7 Non Aqueous Liquid Developer and other Chemetall products in bulk and in lose to users in Dubai and other emirates. Fill the Form above to place an inquiry.
Looking for a different Chemetall Product?
Head on to Chemetall Products page to view what other products we stock or send us an inquiry on sales@saftechhardware.ae or via Whatsapp.